shop.lovessweetarrow.com/oliviaandmindy
1: for #FullDeckChallenge3; prompt: fairy
2: for #AlteredIndex2025; prompt: geometric shapes
More info in alt text.
1: for #FullDeckChallenge3; prompt: fairy
2: for #AlteredIndex2025; prompt: geometric shapes
More info in alt text.
Here's hoping the resolution doesn't cost $$$.
🙏🤞
Here's hoping the resolution doesn't cost $$$.
🙏🤞
She asked for 28. I did 48. Why, yes, I *am* a bit of an over-achiever. 😆
She asked for 28. I did 48. Why, yes, I *am* a bit of an over-achiever. 😆
Upshot: they basically couldn't tell me if the intraocular implants were covered.
ISTG.
Upshot: they basically couldn't tell me if the intraocular implants were covered.
ISTG.
(He's literally been in here for 10 whole minutes.)
(You can hear my stepdad on the other side of the door scolding Frankie.)
(He's literally been in here for 10 whole minutes.)
(You can hear my stepdad on the other side of the door scolding Frankie.)
(Reply to this post with your own art/website etc. But only if you’re an organic life-form).
www.worldofmoose.com
(Reply to this post with your own art/website etc. But only if you’re an organic life-form).
www.worldofmoose.com
Left:
For #FullDeckChallend3; prompt: Lace
Right:
For #AlteredIndex2025; prompt: Label(s)
more info in alt text.
I've also worked on more bookmarks for my sister & other small things. Photos at some point.
Left:
For #FullDeckChallend3; prompt: Lace
Right:
For #AlteredIndex2025; prompt: Label(s)
more info in alt text.
I've also worked on more bookmarks for my sister & other small things. Photos at some point.
explore: merl-shop.co.uk
explore: merl-shop.co.uk
AMZ: go.oliviadade.com/WOOamz
Other links: go.oliviadade.com/WOOprh
AMZ: go.oliviadade.com/WOOamz
Other links: go.oliviadade.com/WOOprh
Sigh.
Sigh.
Note: spoilers here, if you've not seen the movie.
Breakdown by Mia Goth & GDT, composer Alexandre Desplat, cinematographer Dan Lausten, set designer Tamara Deverell, makeup artist Mike Hill, and costume designer Kate Hawley.
Note: spoilers here, if you've not seen the movie.
Breakdown by Mia Goth & GDT, composer Alexandre Desplat, cinematographer Dan Lausten, set designer Tamara Deverell, makeup artist Mike Hill, and costume designer Kate Hawley.
That is all.
Also, ICYMI, Frankenstein was a banger.
That is all.
Also, ICYMI, Frankenstein was a banger.
If you've seen it, here's a good write-up of the creature's look.
If you've seen it, here's a good write-up of the creature's look.