🔗 tritag.ca
They use the same Bombardier Flexity Freedom vehicles as the ION in Waterloo, except in a 2-car configuration
Was pretty fast in the tunnels (50km/h) but slower in the surface sections. Better TSP still needed
They use the same Bombardier Flexity Freedom vehicles as the ION in Waterloo, except in a 2-car configuration
Was pretty fast in the tunnels (50km/h) but slower in the surface sections. Better TSP still needed
📅 Sunday, February 8
⏰ 7:30 AM
📍Kitchener GO (accessibility cab area)
Train Departs: 7:49 AM
Arrives Mount Dennis: 9:19AM
We’ll ride to Kennedy and back to Eglinton Station for lunch and meet @ttcriders.bsky.social at 1:00pm!
📅 Sunday, February 8
⏰ 7:30 AM
📍Kitchener GO (accessibility cab area)
Train Departs: 7:49 AM
Arrives Mount Dennis: 9:19AM
We’ll ride to Kennedy and back to Eglinton Station for lunch and meet @ttcriders.bsky.social at 1:00pm!
Reply or DM us!
Opening Day: Sunday February 8
→ First westbound train departs Kennedy Station at 7:30 a.m.
→ First eastbound train departs Mount Dennis Station at 7:37 a.m.
→ Trains every 4 mins during peak,
every 6 mins otherwise
Reply or DM us!
What counts as transit advocacy? We discuss the nuances and challenges of building a transit advocacy movement, culture, and education.
Available on our website dwelltime.ca which also has links to multiple platforms!
Thank you to everyone who showed up. Let us know if you have any ideas or venue recommendations for next time!
Thank you to everyone who showed up. Let us know if you have any ideas or venue recommendations for next time!
📆 Sunday, Feb 1st
⏰ 2:00 - 4:00 pm
📍ABE ERB - Downtown Kitchener
Floor 1, Tannery Building
151 Charles St W
Take a look below!🚈6️⃣
open.substack.com/pub/urbanplu...
Take a look below!🚈6️⃣
open.substack.com/pub/urbanplu...
📆 Sunday, Feb 1st
⏰ 2:00 - 4:00 pm
📍ABE ERB - Downtown Kitchener
Floor 1, Tannery Building
151 Charles St W
📆 Sunday, Feb 1st
⏰ 2:00 - 4:00 pm
📍ABE ERB - Downtown Kitchener
Floor 1, Tannery Building
151 Charles St W
📆 Sunday, January 25th
⏰ 2:00 - 4:00 pm
📍ABE ERB - Downtown Kitchener
151 Charles St W, Kitchener, ON N2G 1H6
Floor 1, Tannery Building
📞 Call 519-585-7555
📝 Fill out the feedback form - link below!
…or send me a message!
📞 Call 519-585-7555
📝 Fill out the feedback form - link below!
…or send me a message!
📆 Sunday, January 25th
⏰ 2:00 - 4:00 pm
📍ABE ERB - Downtown Kitchener
151 Charles St W, Kitchener, ON N2G 1H6
Floor 1, Tannery Building
📆 Sunday, January 25th
⏰ 2:00 - 4:00 pm
📍ABE ERB - Downtown Kitchener
151 Charles St W, Kitchener, ON N2G 1H6
Floor 1, Tannery Building
Share your feedback online at cambridge.ca/engage
Survey closes Feb 8
Share your feedback online at cambridge.ca/engage
Survey closes Feb 8
With proper signal priority, reliable service, and a flexible route, Waterloo Region's LRT is a good example of a successful transit service and planning tool. Though it has a few issues - including some slow sections and a restrictive operating contract -…
With proper signal priority, reliable service, and a flexible route, Waterloo Region's LRT is a good example of a successful transit service and planning tool. Though it has a few issues - including some slow sections and a restrictive operating contract -…
Adopt your local bus stop today to keep it cleared and happy!
Adopt your local bus stop today to keep it cleared and happy!
ION LRT: Slight hour disruption between a small section in the north between two stations. Service has been restored.
Finch West LRT: Shut down since this morning.
ION LRT: Slight hour disruption between a small section in the north between two stations. Service has been restored.
Finch West LRT: Shut down since this morning.
www.ctvnews.ca/kitchener/ar...
www.ctvnews.ca/kitchener/ar...