opensource energy models
#openenergytracker
Podcast #fossilfrei
ÖPNV Ultra
VfB
Dad
Here: Deutsch, English, and Denglisch
1️⃣ Realistischere Annahmen für Fahrleistungen von Batterie-Lkw
2️⃣ Vorausschätzung der tatsächlichen Emissionsfaktoren für den Strommix
3️⃣ Überarbeitung der Berechnungslogik, damit Energieeffizienzunterschiede korrekt abgebildet werden (Anpassungsfaktor auf Referenzenergie)
1️⃣ Realistischere Annahmen für Fahrleistungen von Batterie-Lkw
2️⃣ Vorausschätzung der tatsächlichen Emissionsfaktoren für den Strommix
3️⃣ Überarbeitung der Berechnungslogik, damit Energieeffizienzunterschiede korrekt abgebildet werden (Anpassungsfaktor auf Referenzenergie)
↗️ Die THG-Emissionen des Ladestroms werden wegen eines veralteten Strommix zu hoch angesetzt
💡 Die Energieeffizienzvorteile von Batterie- gegenüber Brennstoffzellen-Lkw werden nicht ausreichend berücksichtigt.
↗️ Die THG-Emissionen des Ladestroms werden wegen eines veralteten Strommix zu hoch angesetzt
💡 Die Energieeffizienzvorteile von Batterie- gegenüber Brennstoffzellen-Lkw werden nicht ausreichend berücksichtigt.
▶️ The overall fleet of fully electric cars is now just below 2 million.
▶️ The wedge between the actual fleet and the target path envisaged by the previous government (15 mio BEV by 2030) still increases.
▶️ The overall fleet of fully electric cars is now just below 2 million.
▶️ The wedge between the actual fleet and the target path envisaged by the previous government (15 mio BEV by 2030) still increases.
▶️ In October, the share of fully electric cars in all newly registered cars has slightly increased again to 21.0%.
▶️ From Jan-Oct 25, the average share of BEV was 18.4%.
▶️ On top, there were 12.4% plug-in hybrids in October.
▶️ In October, the share of fully electric cars in all newly registered cars has slightly increased again to 21.0%.
▶️ From Jan-Oct 25, the average share of BEV was 18.4%.
▶️ On top, there were 12.4% plug-in hybrids in October.
▶️ To achieve the 10 GW target, not only would all projects with a concrete start date that are at least at the feasibility study level have to be realized, but also many of the less mature conceptual projects.
▶️ To achieve the 10 GW target, not only would all projects with a concrete start date that are at least at the feasibility study level have to be realized, but also many of the less mature conceptual projects.
▶️ There are more than 8 GW for which feasibility studies are underway.
▶️ There are (less concrete) concepts for projects with a total capacity of nearly 26 GW.
▶️ There are more than 8 GW for which feasibility studies are underway.
▶️ There are (less concrete) concepts for projects with a total capacity of nearly 26 GW.
▶️ The National Hydrogen Strategy sets an electrolysis capacity target of 10 GW(el) in 2030.
▶️ The installed capacity today is still below 200 MW, i.e. less than two percent of the 2030 target.
▶️ The National Hydrogen Strategy sets an electrolysis capacity target of 10 GW(el) in 2030.
▶️ The installed capacity today is still below 200 MW, i.e. less than two percent of the 2030 target.