Link Log
linklog.bsky.social
Link Log
@linklog.bsky.social
Bringing you updates and news about the Link Light Rail system in Seattle, WA 🚊🚋
Reposted by Link Log
At today's Sound Transit board meeting, Dow Constantine says that systems integration testing on the 2 Line across Lake Washington has ramped up, with trains crossing the bridge seven days a week, from 8pm to 7am.
October 23, 2025 at 8:45 PM
Reposted by Link Log
The first East Link train under its own power on the floating bridge!
September 9, 2025 at 7:15 AM
Reposted by Link Log
BREAKING: Sound Transit expects to conduct its first LIVE WIRE test on the I-90 bridge TONIGHT, at around 11pm.

"A single light rail vehicle will travel at incremental speeds between 10 and 55 mph to test power systems between Mercer Island and Judkins Park stations, including the I-90 bridge."
September 8, 2025 at 11:51 PM
New Video: Up-close footage from @sound-transit.bsky.social dead car test of the Link 2 Line across Lake Washington on the I-90 bridge

#seattle #washington #lightrail #linklightrail #soundtransit #transit #infrastructure

youtu.be/V3rPaYDnbhk?...
I-90 Floating Bridge Dead Car Tow Test - Eastside Link Light Rail Testing
YouTube video by LinkLog
youtu.be
June 11, 2025 at 1:53 AM
New Video: Timelapse of the @sound-transit.bsky.social dead car tow testing this week, as captured on the WSDOT cameras
#lightrail #seattle #transit

youtu.be/pGbxxPO7FRU?...
Seattle Light Rail I-90 Dead Car Tow Timelapse
YouTube video by LinkLog
youtu.be
May 23, 2025 at 4:23 PM
Reposted by Link Log
A world first, right here in our region.

Today, a Link light rail train crossed a floating bridge on rails for the very first time — marking a huge milestone for the 2 Line.

We’ll be sharing more photos and videos soon, so stay tuned!
May 21, 2025 at 11:40 PM
Light rail car 128 now headed eastbound back across I-90 after making it over to the Judkins Park station in Seattle.
May 21, 2025 at 7:49 PM
Reposted by Link Log
OMG you all IT’S HAPPENING RIGHT NOW
May 21, 2025 at 4:36 PM
A kinkisharyo link light rail train currently sits at the east end of the I-90 bridge ahead of testing today. The train will be pushed along the tracks, not under its own power. This is part of 2 line testing for the east link extension
May 21, 2025 at 4:12 PM