This means:
🙌 Detailed technical designs for the lifts are being developed
⌛ The design phase is set to be completed by summer 2025
🏗️ Construction could begin as early as late 2025 and is expected to take 18 months
This means:
🙌 Detailed technical designs for the lifts are being developed
⌛ The design phase is set to be completed by summer 2025
🏗️ Construction could begin as early as late 2025 and is expected to take 18 months