This design language took, uh, courage.
This design language took, uh, courage.
Get yours: beta.nyc/support-us-n...
Get yours: beta.nyc/support-us-n...
Thanks, Zuck!
www.theatlantic.com/technology/a...
Thanks, Zuck!
www.theatlantic.com/technology/a...
Further still, if I were negotiating on behalf of Canada, I'd ensure statehood or representation for all other US territories. Here's what that would look like:
Further still, if I were negotiating on behalf of Canada, I'd ensure statehood or representation for all other US territories. Here's what that would look like:
Should Canada join the United States, it should insist on having proportional representation in Congress. Here's what would happen in the House (assuming kept to 435):
Should Canada join the United States, it should insist on having proportional representation in Congress. Here's what would happen in the House (assuming kept to 435):
Wired: "copy as markdown"
Wired: "copy as markdown"
Maybe it's time to switch to podman.
Maybe it's time to switch to podman.
(I'm in NYC, not sure why there'd be a content restriction)
(I'm in NYC, not sure why there'd be a content restriction)
(I don’t live in the Bay Area, and I love cold weather.)
(I don’t live in the Bay Area, and I love cold weather.)
Bought into community distributed generation. (I live in Manhattan, so not possible to put up solar panels.)
I’d say it’s working out.
Bought into community distributed generation. (I live in Manhattan, so not possible to put up solar panels.)
I’d say it’s working out.
(Happy Great American Holiday, y’all)
(Happy Great American Holiday, y’all)
Also, even a 10% reduction can do wonders for congestion.
Also, even a 10% reduction can do wonders for congestion.