🌍 Total: 462 GW
🔥 Non-Renewable : 52.90%
◾ Coal– 212.35 GW
◾ Gas– 24.82 GW
◾ Lignite– 6.62 GW
◾ Diesel– 0.59 GW
🌱 Renewable : 47.10%
☀️ Solar– 97.86 GW
💨 Wind– 48.15 GW
🌊 Large Hydro– 46.97 GW
☢️ Nuclear- 8.18GW
💧 Small Hydro– 5.1 GW
🌿 Biomass– 10.73 GW
🌍 Total: 462 GW
🔥 Non-Renewable : 52.90%
◾ Coal– 212.35 GW
◾ Gas– 24.82 GW
◾ Lignite– 6.62 GW
◾ Diesel– 0.59 GW
🌱 Renewable : 47.10%
☀️ Solar– 97.86 GW
💨 Wind– 48.15 GW
🌊 Large Hydro– 46.97 GW
☢️ Nuclear- 8.18GW
💧 Small Hydro– 5.1 GW
🌿 Biomass– 10.73 GW
🛵:
1.15M registered, 6.07% penetration
🛺 :
0.69M new, 56.58% penetration!
🚘 :
99,055 registered, 1.99% of the segment
🚌 :
3,612 units, 5.25% share
🚛 Light Goods :
5,997 units, a 162.68% YoY jump
🚚 Trucks:
224 units
🛵:
1.15M registered, 6.07% penetration
🛺 :
0.69M new, 56.58% penetration!
🚘 :
99,055 registered, 1.99% of the segment
🚌 :
3,612 units, 5.25% share
🚛 Light Goods :
5,997 units, a 162.68% YoY jump
🚚 Trucks:
224 units
Launching Two Models 🛵- Activa E (Swappable) and CQ1 (Fixed).
Activa E
Two 1.5kWh Swappable packs
Two Variants - with and without connected features
102km Honda Claimed Range
80kmph top
0-60kmph in 7.3sec
PMSM 6kW Motor
Launching Two Models 🛵- Activa E (Swappable) and CQ1 (Fixed).
Activa E
Two 1.5kWh Swappable packs
Two Variants - with and without connected features
102km Honda Claimed Range
80kmph top
0-60kmph in 7.3sec
PMSM 6kW Motor
BE 6e & XEV 9e, design is futuristic, sporty and eye catching.
59kWh & 79kWh LFP🔋 Battery Pack
BYD Blade Cells
Prices for 59kWh pack are out
BE 6e - ₹18.8L
XEV 9e - ₹21.9L
6e - 4371 X 1907 X 1627mm
9e - 4789 X 1907 X 1694mm
BE 6e & XEV 9e, design is futuristic, sporty and eye catching.
59kWh & 79kWh LFP🔋 Battery Pack
BYD Blade Cells
Prices for 59kWh pack are out
BE 6e - ₹18.8L
XEV 9e - ₹21.9L
6e - 4371 X 1907 X 1627mm
9e - 4789 X 1907 X 1694mm
Already has agreement for 3.6MW WTG .
www.manufacturingtodayindia.com/jsw-energy-w...
Already has agreement for 3.6MW WTG .
www.manufacturingtodayindia.com/jsw-energy-w...
Are they going to launch it ever?
Credits :- Mr Akram, An EV enthusiast
Are they going to launch it ever?
Credits :- Mr Akram, An EV enthusiast
Are we getting our first proper EV in market by any Indian company? Seems so👀
- 59 & 79kWh LFP Pack 🔋
- BYD Blade cells
- 20 to 80% in 20 min on a 175kW charger⚡
- 170kW to 210kW motor
- Brake by wire
Let's see how they price it
Are we getting our first proper EV in market by any Indian company? Seems so👀
- 59 & 79kWh LFP Pack 🔋
- BYD Blade cells
- 20 to 80% in 20 min on a 175kW charger⚡
- 170kW to 210kW motor
- Brake by wire
Let's see how they price it
They have been running trial of 5 Electric trucks since January.
Aims to deploy 500 trucks by June 2025😲!
Wow this is big ⚡🚚🔋
They have been running trial of 5 Electric trucks since January.
Aims to deploy 500 trucks by June 2025😲!
Wow this is big ⚡🚚🔋
Thanks to Zeon .
Peaks at 49kW, which is higher than stated 45kW! Maintains upto 42kW till 70%.
4 - 80% in 42 minute.
Thanks to Zeon .
Peaks at 49kW, which is higher than stated 45kW! Maintains upto 42kW till 70%.
4 - 80% in 42 minute.
This vehicle size wise sits between Punch & Nexon.
Dimensions are - 3950×1708×1580(mm)
Boot Size - 370L
CLTC Range - 170 to 410km
30/50kW motor.
Too many cell options 👀
This vehicle size wise sits between Punch & Nexon.
Dimensions are - 3950×1708×1580(mm)
Boot Size - 370L
CLTC Range - 170 to 410km
30/50kW motor.
Too many cell options 👀
Non thermal capacity stands at 68%😲!
👏👏 Let's go! More renewables ⚡.
Now watch for the growth of BESS 🔋🔋. @elonmusk
Non thermal capacity stands at 68%😲!
👏👏 Let's go! More renewables ⚡.
Now watch for the growth of BESS 🔋🔋. @elonmusk
The Katghora lithium and rare earth elements block in Chhattisgarh was awarded to the company.
Graphite blocks were too awarded to other companies.
The Katghora lithium and rare earth elements block in Chhattisgarh was awarded to the company.
Graphite blocks were too awarded to other companies.
3.96% of Registered 2w 🛵 were Electric⚡️
52.47% of Registered 3w 🛺 were Electric⚡️
1.88% of Registered 4w 🚘 were Electric⚡️
2.96% of Registered Buses 🚎 were Electric⚡️
2w down a lot compared to March. March was high due to subsidies ending.
3.96% of Registered 2w 🛵 were Electric⚡️
52.47% of Registered 3w 🛺 were Electric⚡️
1.88% of Registered 4w 🚘 were Electric⚡️
2.96% of Registered Buses 🚎 were Electric⚡️
2w down a lot compared to March. March was high due to subsidies ending.
Along with 2-3w & battery storage they mention, it's also good to keep in mind that Tesla is a customer of panasonic cells too.
Along with 2-3w & battery storage they mention, it's also good to keep in mind that Tesla is a customer of panasonic cells too.
Prices take as on 15/03/24
Considered US and Aus prices as CIF. Pretty good if they can get close to these
Prices take as on 15/03/24
Considered US and Aus prices as CIF. Pretty good if they can get close to these
BALL In Tesla's court now
SECI's 100MW Solar with 40MW/120MWh BESS is located in Rajnandgaon, Chhattisgarh.
451 acres of waste land across 9 villages in Tehsil Dongargarh and Dongargaon, District Rajnandgaon, have been repurposed.
SECI's 100MW Solar with 40MW/120MWh BESS is located in Rajnandgaon, Chhattisgarh.
451 acres of waste land across 9 villages in Tehsil Dongargarh and Dongargaon, District Rajnandgaon, have been repurposed.
India already has a plan to increase its present installed nuclear power capacity of 7,480 MW to 22,480 MW by 2031-2032 in a progressive manner.
www.thehindu.com/sci-tech/sci...
India already has a plan to increase its present installed nuclear power capacity of 7,480 MW to 22,480 MW by 2031-2032 in a progressive manner.
www.thehindu.com/sci-tech/sci...
Under the deal, KABIL will undertake the exploration and development of five lithium brine blocks spanning 15,703 hectares in Argentina's Catamarca province.
t.co/F1Y2Lc8Jcn
Under the deal, KABIL will undertake the exploration and development of five lithium brine blocks spanning 15,703 hectares in Argentina's Catamarca province.
t.co/F1Y2Lc8Jcn
Recently 300kWp Solar on Agatti Island & 1.4MW Solar with 1.4MWh Battery on Kavaratti Island was inaugurated, covering 18% electricity requirement of the Kavaratti island.
Recently 300kWp Solar on Agatti Island & 1.4MW Solar with 1.4MWh Battery on Kavaratti Island was inaugurated, covering 18% electricity requirement of the Kavaratti island.
- Senior Supplier Industralisation Engineer
- Materials Planner
- www.teslaclub.in/forum/genera...
- Senior Supplier Industralisation Engineer
- Materials Planner
- www.teslaclub.in/forum/genera...
EVs across all segments crossed 1.5 Million registrations accounting for 6.39% of all vehicles⚡️! Up 49.25% compared to 2022
EVs across all segments crossed 1.5 Million registrations accounting for 6.39% of all vehicles⚡️! Up 49.25% compared to 2022
www.teslaclub.in/post/dissect...
www.teslaclub.in/post/dissect...