#SewageSystem
🚽 Have you ever wondered what happens after you flush?🚰 #MattWheeldon of #WessexWater takes you on a journey of the #Bath #sewagesystem 🪠

🗓 Thursday, 6 February, 7:30 pm – 9:00 pm GMT
📍Bath Royal Literary & Scientific Institution (BRLSI)
🎟 £3.00 – £6.00

www.brlsi.org/whatson/what...
February 5, 2025 at 6:21 PM
WastewaterFact 8/10: 🛠️ Germany’s Sewer Network
Germany’s public sewer system covered about 619,000 km in 2022 – that’s over 15 times the length of the equator.
🔗 Source: German Federal Statistical Office)
#WaterFacts #Infrastructure #SewageSystem #Engineering #WaterTreatment #WaterGovernance
May 23, 2025 at 3:39 PM
This stinks to high heaven, but then so does the POTUS and the rest of his administration.

At this rate, the USA is in for a name change like the Gulf of Mexico to the United Sewagesystem of America.
July 30, 2025 at 7:39 PM
☕ Web Chick Update
📝 The 2025 registration lists for Installers, Sewage Haulers & Pumpers are now available at the Fairfield County Health.
#FairfieldCounty #SewageSystem #InstallerList #ServiceProviders
Sewage Treatment Systems | Fairfield County Health Department
Fairfield County remains one of the fastest growing counties in the state. With nearly 82,000 new people expected to move to Fairfield County by the year 2030, the county's infrastructure will soon be...
www.fairfieldhealth.org
October 22, 2025 at 12:55 AM
Emergency Fix For Hotel Sewage Station Ok'd
Fairhope, Alabama    Morefield addressing council today.   Grand lift station.   CATASTROPHIC FAILURE OF TANK The city council declared an emergency and authorized expedited repairs to the sewage lift/pump station at the Grand Hotel in Point Clear (#1 Grand Drive) where the wet-well/collection tank failed during the heavy rainstorm of May 10 (over 4 inches). Sewer department superintendent Morefield said the aging tank made of concrete was already in bad shape -- and the whole station was already scheduled for refurbishment anyway.  ANOTHER LIFT STATION PLANNED TOO An  additional, regional lift station already planned for the neighborhood about one thousand feet south on Scenic 98 will be expedited as well, since the two are designed to work in unison.   TEMPORARY PUMPS IN INTERIM Two temporary, bypass bumps will be installed to continue uninterrupted service to the hotel until final repairs are completed. That should take about 6 months, he said. Cost should be about $750K to refurbish the damaged station, $2.8 million for the new one down the road, and $250K for the temporary by-pass pumps -- including connecting pipes and engineering cost (all not-to-exceed figures). Since most of the upgrades were previously planned, funding was already included in this year's budget; how much of that may be reimbursed by grants was not mentioned during this meeting. New hotel-area plan. http://feeds.feedburner.com/TheFairhopeTimes
dlvr.it
May 15, 2025 at 1:58 AM