toledobikemap.bsky.social
@toledobikemap.bsky.social
There might be opportunity for public comment and this also provides a chance to gather and discuss the state of bicycling in Toledo and advocacy needs with fellow bicyclists. Any more details will be posted if they become available.
May 4, 2025 at 7:14 PM
Other groups will also head off towards Maumee following the ribbon cutting.
April 21, 2025 at 1:41 PM
Spreadsheet summarizing projects in the 2026-2029 TIP with bike related components: docs.google.com/spreadsheets...
TMACOG TIP FY 2026-2029 Public Involvement Draft Bike Projects
docs.google.com
March 13, 2025 at 4:52 PM
You can make comments using the form on their website, by phone/mail/email, or at one of the two scheduled public meetings. See TMACOG’s TIP webpage for details on how to submit comments. Public comment period ends 4/11/2025. tmacog.org/news/comment...
Comment on the 2026-2029 Transportation Improvement Program
TMACOG will accept public review and comment through April 11 on the 2026-2029 Transportation Improvement Program (TIP).
tmacog.org
March 13, 2025 at 4:52 PM
The bike lanes roughly connect with the Sylvania River Trail at Harroun Park and provide an alternate option to the Silica Drive route when traveling either way between Downtown Sylvania and points south.
March 12, 2025 at 12:09 PM
The bike lanes end short of Monroe Street and Convent Boulevard at each end and require taking the lane to continue on Main Street in either direction.
March 12, 2025 at 12:09 PM
-Future: Front Street and Main Street, Secor Road Corridor, Dorr Street to Adams Street, Summit Cycle Track, and possibly Washington Street.
January 22, 2025 at 9:37 PM
-Ongoing:
-Broadway Corridor Reconstruction - Road reconstruction including bike lanes.
-Martin Luther King Jr. Bridge - Bridge reconfiguration including multi-use path and Glass City Riverwalk connection.
January 22, 2025 at 9:37 PM
In addition the the City of Toledo has several ongoing and future projects with bicycling infrastructure components.
January 22, 2025 at 9:37 PM
-Whitmer Drive (West Alexis Road to Tremainsville Road) - Road reconstruction includes multi-use path. Connects to Whitmer High School and Tremainsville Road Bike Lanes. 1.00 lane miles.
January 22, 2025 at 9:37 PM
-Wenz Road (Angola Road to Parkcliff Lane) - Road reclamation includes bike path. Connects to Angola Sidepath/Wenz Road Bike Lanes and near Swan Creek Metropark Preserve. 0.42 lane miles.
January 22, 2025 at 9:37 PM
-Water Street (Cherry Street to Olive Street) - Road reconstruction includes multi-use path. Connects to Glass City Riverwalk (under construction)/existing Riverside Trail. 1.43 lane miles.
January 22, 2025 at 9:37 PM
-South Byrne Road (South Detroit Avenue to Heatherdowns Boulevard) - Road resurfacing includes road diet and bike lanes. Connects to South Detroit Avenue Bike Lanes and close to the South Chessie Circle Trail. 3.64 lane miles.
January 22, 2025 at 9:37 PM
See a summary of these projects below and go to the City of Toledo Roads Facebook page or Roads Construction webpage (toledo.oh.gov/.../transpor...) for more information and lists/maps.
toledo.oh.gov
January 22, 2025 at 9:37 PM