Also gives $476m in Intercity rail funding, requires Metra to operate the RI district as "Regional rail" (pilot) before 01/1/2027 and has provisions for studying extending the Metra Electric to Kankakee among many other things in the bill~
Also gives $476m in Intercity rail funding, requires Metra to operate the RI district as "Regional rail" (pilot) before 01/1/2027 and has provisions for studying extending the Metra Electric to Kankakee among many other things in the bill~
Service begins next year
Service begins next year
Map by me
Map by me
Need these to pass if we want a chance at getting QC rail soon. 1/2
Need these to pass if we want a chance at getting QC rail soon. 1/2
Wish this would happen someday
Wish this would happen someday
The Amtrak Borealis will be running limited operations starting tomorrow. The Borealis was canceled because of the Horizon recall, but will be back up and running limited service using Superliners.
The Amtrak Borealis will be running limited operations starting tomorrow. The Borealis was canceled because of the Horizon recall, but will be back up and running limited service using Superliners.
This is catastrophic and will most likely mean most Amtrak routes in the Midwest, PNW and California will not be operating at capacity or at all
This is very bad
This is catastrophic and will most likely mean most Amtrak routes in the Midwest, PNW and California will not be operating at capacity or at all
This is very bad
Metro Transit Gold line BRT opens March 22nd
MBTA South Coast rail opens March 24th
Metro Transit Gold line BRT opens March 22nd
MBTA South Coast rail opens March 24th