Theodore Paradise
banner
theodoreparadise.bsky.social
Theodore Paradise
@theodoreparadise.bsky.social
#energy & #transmission, doubling the capacity of the grid with the leading advanced conductor ACCC; Chief Policy and Grid Strategy Officer at CTC Global; fan of beautiful moments / places / thoughts; returns 🛒
It’s a very positive bill #transmission - some observations from the day it was voted out of committee in July here: www.linkedin.com/posts/theodo...
Senate Committee on Energy & Natural Resources markup on EPRA | Theodore Paradise posted on the topic | LinkedIn
In honor of the U.S. Senate Committee on Energy & Natural Resources markup today of Senator Manchin's and Barrasso's #Energy Permitting Reform Act (#EPRA) of…
www.linkedin.com
November 26, 2024 at 1:24 PM
Hi Josh. Yes, agree the EMS will be looking at the flows. If there is a drastic action limit on other lines < ⏰ than redispatch, then limit. But other lines may pick up additional flows only during STE/LTE periods. More adv conductors up will raise that b/c much higher/longer contingency carry.
November 24, 2024 at 1:51 PM
What's the problem to solve? If the problem is time and getting new transmission built is a 7-10 yr timeframe, then reconductoring/rebuilding at the same voltage is the solution; substation work is not usually wrapped up in siting issues. 30% efficiency gain is day 1 w/out downstream upgrades.
November 24, 2024 at 5:12 AM
Have quickly found that it's #energysky
November 24, 2024 at 4:29 AM
Oh this looks good
November 24, 2024 at 4:19 AM
Very cool - one for advanced conductors?
November 24, 2024 at 4:01 AM
Really helpful, thanks Tyler!
November 24, 2024 at 3:59 AM
Just found my way here too, Jeff. Great to see you and keep up here.
November 24, 2024 at 3:54 AM