Brian Antifa Ragle
banner
ragle.vagabondvisions.studio
Brian Antifa Ragle
@ragle.vagabondvisions.studio
#Photographer and #writer
#gamer, #technology enthusiast


https://vagabondvisions.beehiiv.com/

@vagabondvisions.bsky.social
Reposted by Brian Antifa Ragle
🚨 1️⃣New long-form essay is live on Medium: “They’re Eating the Dogs: A Thousand Years of Fascist Lies.”
From medieval monks inventing blood libel to Trump raving about migrants eating pets, it’s the same smear recycled for a thousand years.
medium.com/@brian.ragle...
They’re Eating the Dogs: How the Far Right Turned Disgust Into a Thousand-Year Weapon
Why Fascists Keep Telling You Outsiders Eat Children and Pets
medium.com
September 25, 2025 at 4:19 PM
Reposted by Brian Antifa Ragle
1️⃣ The Dallas shooting at an ICE facility is once again raising more questions than are being answered, especially by the law enforcement dribbling out information. They released this photo of ammo recovered at the scene and it's....odd.
September 24, 2025 at 6:58 PM
Reposted by Brian Antifa Ragle
I mean, it looks like a hand signal. He's either greenlighting the shot or telling someone to steal third base. No question those guys are signaling someone or something.
It’s really starting to look like a professional hit by the right TBH.

Watch this.

All the hand gestures starting with him touching his cap are signals.

Kirk is shot immediately after that final hand signal. Not a coincidence.

This is the kind of thing you’d see in the movies.
September 11, 2025 at 9:51 PM
Reposted by Brian Antifa Ragle
5. ...among black communities as protection against white nationalist/supremacist violence. In that very real and karmic sense, Charlie Kirk lost the gun debate.
September 11, 2025 at 10:09 AM
Reposted by Brian Antifa Ragle
4. Charlie Kirk died as part of the price *he* believed was necessary for the white Christian nationalist veneration of gun ownership, a peculiar ideological strain of conservatism that became more pronounced in the 1960s and 70s, following the encouragement of gun ownership...
September 11, 2025 at 10:09 AM
Reposted by Brian Antifa Ragle
3. Conservatism bends toward fascism because fascism is an extreme albeit natural conclusion to what conservatism preaches and holds, especially in the US and Europe, which are dominated by white Christians for centuries.
September 11, 2025 at 10:09 AM
Reposted by Brian Antifa Ragle
2. ...becomes more overt and open about the fascism that has influenced their policy positions since the 1950s. Conservatism in the US has always been rooted in white Christian nationalism and the "fascism" name for an ideology constructed around that came in the 1930s.
September 11, 2025 at 10:09 AM
Reposted by Brian Antifa Ragle
1. Let's be clear here, #CharlieKirk was a white Christian nationalist. That's a key component of the kind of #fascism that political conservatism has held for 200+ years in the US. To call this out isn't unfair or "demonization". It's accurate and it's timely as the #Republican party...
September 11, 2025 at 10:09 AM
Reposted by Brian Antifa Ragle
Spent the evening photographing tiny people with large cows. Yes, really.

More a little later.
a woman talking on a cell phone with the words i gotta go julia above her
ALT: a woman talking on a cell phone with the words i gotta go julia above her
media.tenor.com
September 10, 2025 at 11:16 AM
Nice Me does the same things as Rude Me, but nicer.
Well, how about that.

¯\_(ツ)_/¯
September 9, 2025 at 3:52 PM
Reposted by Brian Antifa Ragle
🚨 New longform drop 🚨
America’s labor shortages are colliding with the Constitution’s ugliest loophole: “except as punishment for crime.” Trump’s farm crisis “solution” is prison labor...slavery with patriotic branding.

🧵 A thread:
When "Except" Becomes the Rule: Prison Labor, Food Security, and the 13th Amendment's Shadow
How Trump’s labor crisis, ICE raids, and a 19th-century loophole could put prisoners back in America’s fields—and maybe your living room
bit.ly
September 8, 2025 at 10:26 AM
Reposted by Brian Antifa Ragle
America’s crops are rotting, construction sites are stalling, and Trump’s (likely) answer is #slavery via loopholes and Executive Order fiat. My new piece digs into the 13th Amendment loophole fueling the prison labor “solution.” Read it before your strawberries come with chains.

Tomorrow!
September 7, 2025 at 10:52 PM
Reposted by Brian Antifa Ragle
RFK Jr. probably thinks food safety regulations are just another government plot to keep us from enjoying that delicious old-timey chalk milk experience.
September 7, 2025 at 2:41 PM
Reposted by Brian Antifa Ragle
And I meant what I said: Trump has never had an original idea in his life. It's ALL drawn from his own little swiss-cheese memory of pop culture he has been exposed to.
September 6, 2025 at 4:47 PM
Reposted by Brian Antifa Ragle
Because #Trump does not have original ideas and never has, the source for the claim by MiJo that Trump was an #FBI informant targeting Epstein comes from this moment in history, which Trump wants to put himself into.
September 6, 2025 at 4:43 PM
Reposted by Brian Antifa Ragle
I have said it before and I will say it again, if we had hanged all the Confederates, there would likely not even be a Donald Trump, let alone a section of America that constitutes his mouth-breather cult of followers.
September 6, 2025 at 2:36 PM
Reposted by Brian Antifa Ragle
📊 New essay: Nate Silver thinks he’s discovered a new disorder called #Blueskyism.
Spoiler: it’s not real. It’s just what happens when nobody here likes Nate very much.

vagabondvisions.beehiiv.com/p/what-nate-...
What Nate Silver Gets Wrong About "Blueskyism"
A response essay in 1,600 words of exasperated clarity
vagabondvisions.beehiiv.com
September 6, 2025 at 10:06 AM
Reposted by Brian Antifa Ragle
1️⃣ On Sunday, I am publishing what I personally consider the most densely researched article I have ever done. Certainly among the longest. It's about #Hungary, a small European country most Americans couldn't find on a map without Google's help.

vagabondvisions.beehiiv.com/subscribe
September 5, 2025 at 11:04 PM
Reposted by Brian Antifa Ragle
📊 Nate Silver thinks he’s diagnosed a new disease: #Blueskyism.
Tomorrow I’ll explain why what really bothers him isn’t the platform’s “pessimism”… it’s that nobody here likes him very much.

Stay tuned.
vagabondvisions.beehiiv.com/subscribe
September 5, 2025 at 6:15 PM
Reposted by Brian Antifa Ragle
Checking in from #Tennessee where I just got my 71 year old mother her #COVID, #RSV, #flu, and first round #Shingles #vaccines. I'm 50 and got a free flu vaccine but they wanted $190 for the COVID vax (writers/photographers don't have great #insurance ...or any insurance).

Not today, RFK!!
September 5, 2025 at 2:49 PM
The right wing helpfully provide me with a LOT of fodder to dismantle with a fact-blender.
🎪 Step right up, folks! Dinesh D’Souza and #PragerU are hawking The Lost Cause of #Fascism: a shiny "new" con where #Nazis were “socialists” and the right are forever the good guys. Spoiler: it’s all snake oil.

Full takedown here->
vagabondvisions.beehiiv.com/p/the-lost-c...
The Lost Cause of Fascism: D’Souza’s Comfort Lies for the Right
The latest in an ongoing series where I dismantle PragerU disinformation
vagabondvisions.beehiiv.com
September 5, 2025 at 10:31 AM
Reposted by Brian Antifa Ragle
How far back in US history do you want to go? We didn't hang all the Confederates would be a good starting point for how we got here. But more recently, we imported a bunch of fascists who took over the GOP, Hydra-style and have been working toward this for half a century:
When We Said “Never Again,” the GOP Heard “Not Yet”
How the Republican Party Became a Safe Space for Nazis, Fascist Collaborators, and Their Apologists
vagabondvisions.beehiiv.com
September 4, 2025 at 12:56 PM
Reposted by Brian Antifa Ragle
1/6 The war on abortion was just the beginning. The war on contraception is the real prize: controlling the very conditions of women’s independence.
#BirthControl #Politics

New deep dive: The War on Birth Control: White Replacement, Musk’s Pseudoscience, and the GOP’s Obsession with Women’s Wombs.
The War on Birth Control: White Replacement, Musk's Pseudoscience, and the GOP's Obsession with Women's Wombs
How the right wing’s white fertility panic turned birth control into enemy number one
vagabondvisions.beehiiv.com
September 4, 2025 at 10:15 AM
Seriously, this was cool as hell for me.
1/7 Look, I'm not a #programmer. I understand some very basic things and can kinda sorta see what some low level code is trying or intended to do, but I can't just sit down and start writing code the way I do my journalism or fiction writing. It just doesn't come naturally to me.
#AI #LLM #Coding
September 3, 2025 at 11:21 PM