Energy tech & policy. Work on storage at Zenobe, based in NYC

May have other interests too.
Why insist on 20 cycles (I assume per day)? The BESS does not need to be cycling (charing/discharging) to provide this instantaneous short-circuit level support? This same mistake is often made when considering inertia from Grid-Forming BESS. It's instantaneous in response to a fault.
June 5, 2025 at 7:56 PM
Can get to 2x with grid-forming and >2 with inverter oversizing
June 5, 2025 at 5:12 PM
A few things (I won these contracts):
- 3x different locations, each BESS is ~4 units separately controlled/traded
- Providing SCL. “Short-circuit fault current” is SMA language
- You may want to spinning mass but GWs of BESS is being built. Making it Grid-Forming = massive cost & stability benefits
June 5, 2025 at 2:53 PM