🧠 The term “water safety” masks critical risk zones. The authors redefine hospital plumbing into 3 zones:
A) Main water system
B) Periphery (e.g. sinks, traps, final 2m of pipe)
C) Main wastewater system
Each zone needs separate oversight & expertise.
#BuiltEnvironment
🧠 The term “water safety” masks critical risk zones. The authors redefine hospital plumbing into 3 zones:
A) Main water system
B) Periphery (e.g. sinks, traps, final 2m of pipe)
C) Main wastewater system
Each zone needs separate oversight & expertise.
#BuiltEnvironment
Check out the sustainability win:
💥 440,532 disposable gowns saved
♻️ 66,080 kg plastic waste avoided
🌍 398,681 kg CO₂ emissions prevented
💸 ~SGD 454k (USD ~$334k) saved
Check out the sustainability win:
💥 440,532 disposable gowns saved
♻️ 66,080 kg plastic waste avoided
🌍 398,681 kg CO₂ emissions prevented
💸 ~SGD 454k (USD ~$334k) saved