jorgepullin.bsky.social
@jorgepullin.bsky.social
Physicist, motorcyclist, bagpiper, marathon runner, blogger, open access editor.
Finished the Run the Runway 5k in 52', an interesting race on the Baton Rouge Airport Runway.
November 22, 2025 at 6:43 PM
The laser conditioning setup outside the clean room. The light enters into the latter via an optical fiber. Photo courtesy of Maryrose Barrios. @LIGO - Livingston
November 22, 2025 at 12:30 AM
Foggy morning at @ LIGO - Livingston
November 19, 2025 at 2:51 PM
November 18, 2025 at 4:43 PM
Speaking at the US Space and Rocket Center in Huntsville, Alabama.
November 16, 2025 at 9:24 PM
Started laying out the optical components needed to steer laser light into the suspension for testing @LIGO - Livingston
November 12, 2025 at 7:51 PM
We received the output mode cleaners for the suspension @LIGO Livingston.
November 11, 2025 at 12:36 AM
Using the clocking tool to set the angles of the bases of the optical mounts @LIGO - Livingston
November 6, 2025 at 10:02 PM
Two of the aOSEMs installed @LIGO - Livingston
November 5, 2025 at 5:43 PM
Built a bunch of aOSEMs (optical sensor and electromagnetic actuator) @LIGO - Livingston
November 4, 2025 at 2:56 PM
The receptions for the candidates for LSU president are held at the suites in Tiger Stadium @lsu.bsky.social
November 1, 2025 at 11:08 PM
Life in the jungle. Found a snake inside our cleanroom, fortunately a small one @LIGO - Livingston
October 31, 2025 at 8:50 PM
Started building the mirror assemblies @LIGO - Livingston
October 28, 2025 at 9:25 PM
The laser blade positioner tools @LIGO - Livingston
October 27, 2025 at 11:22 PM
View of the suspension from above @LIGO - Livingston
October 24, 2025 at 11:15 PM
Built and installed the cable pylons @LIGO - Livingston
October 23, 2025 at 12:11 AM
Using a turnbuckle to compress the blades in order to install the wires of the suspension. @LIGO - Livingston
October 21, 2025 at 11:21 PM
Coco is back
October 19, 2025 at 3:32 PM
Tensioning the wires of the balanced homodyne single suspension @ LIGO - Livingston
October 17, 2025 at 5:10 PM
Getting ready for a book signing at Brownsville, Texas
October 11, 2025 at 11:17 PM
Celebration of the tenth anniversary of the discovery of gravitational waves @utrgv
October 10, 2025 at 2:26 PM
Classic car show, Natchitoches, LA
October 4, 2025 at 10:30 PM
The suspension is coming along nicely. @LIGO - Livingston
October 2, 2025 at 8:48 PM
After helicoiling the suspended mass (under cloth) I proceeded to helicoil the "picture frame" @ LIGO - Livingston
September 30, 2025 at 8:27 PM
Started a new build today. A single suspension for the new homodyne readout. All 340 of those threads you see there need to be helicoiled. Got through about 200 today. @LIGO Livingston.
September 29, 2025 at 9:05 PM