Nathan J Hunt
banner
isnjh.bsky.social
Nathan J Hunt
@isnjh.bsky.social
GEOINT and 3D reconstruction
When a country pretty much blatantly rips off designs as Juche design when it clearly is copy of US MQ-9
May 17, 2025 at 7:50 AM
area that before between the hill that ended in dead end with turnaround now has structure constructed
May 14, 2025 at 3:27 PM
google earth finally updated public imagery of Sohae new assembly and processing building looks nearly completed with roofing installed on main section
May 14, 2025 at 3:27 PM
It appears the new North Korean Ship is equipped with short range ballistic missiles, the black missile with black and white nose stripes. which would explain the very large launch tube hatches at back of ship.
April 26, 2025 at 11:58 AM
Looking back at my older first gen 3D model of the Sohae's newer launch pad area, I am readying to model the updated version with better details and showing inside the pad hanger.
November 13, 2024 at 6:06 AM
November 1, 2024 at 7:52 AM
Special treat for everyone with 3D printers this Halloween, I have posted my KN-11 1/285 scale mini to cults3d for anyone looking to expand their collection of micro DPRK size missile transporters cults3d.com/en/3d-model/...
October 31, 2024 at 10:16 AM
October 3, 2024 at 8:04 AM
HS-17 Cab windows and handle bars installed, lights on roof test fitted and just need to install rear-view mirrors
October 3, 2024 at 5:25 AM
Possible building seen in pic 39°44'45.18"N 125°53'40.42"E
September 19, 2024 at 1:58 PM
September 15, 2024 at 8:14 PM
DPRK has shown off new enrichment facility, next facility to 3D model?
September 13, 2024 at 4:32 AM
Boat almost done just few railings left to install on levels and final deck details
September 12, 2024 at 5:04 PM
Upper deck and decorative arch added
September 12, 2024 at 2:10 AM
Hull on river boat restaurant nearly done on rough drafting.
September 12, 2024 at 12:16 AM
September 11, 2024 at 4:38 PM
Little work in progress modeling a riverboat
September 11, 2024 at 1:21 PM
Did DPRK edit this old pic of the building KJI was inspecting, pic shows three wider wall indents marked with yellow line. but sat image even from time of new construction shows only two wall indents between the balcony sections
April 30, 2024 at 1:38 PM
Update rough measurement from wider angle shot image posted by
@ColinZwirko
March 21, 2024 at 7:47 AM
Some very very rough late measurements of DPRK motor mounted in center of test stand. motor about roughly 783.9cm long with a possible diameter of 83.1cm round.
March 20, 2024 at 7:25 PM
Second set of Hydraulics completed over the past few days and test installed with the first set to ensure smooth operation for raising and lowering now to paint the covers and do installation of pins on HS-17 ICBM TEL
March 14, 2024 at 5:23 AM
Test fitted full hydraulic assembly in chassis and erector arm, held in place by temp pivot pins befor installing tensions pins
March 8, 2024 at 6:01 PM
all together
March 8, 2024 at 4:32 AM
Hydraulic assembly
March 8, 2024 at 4:31 AM
Overnight got the second test print of the Hydraulics setup for the HS-17 printed and the metal cylinders test fitted. #missiles #ICBMTEL
March 8, 2024 at 3:15 AM