falconhand.bsky.social
falconhand.bsky.social
@falconhand.bsky.social
Reposted by falconhand.bsky.social
cmon man, Astros fans can’t read
September 25, 2025 at 5:06 AM
Of course!! We are super glad you were able to show up and enjoy the show with us.
September 9, 2025 at 10:04 PM
That I agree with, the restricted landing slots absolutely make it more challenging. Especially seeing as Bremerton has less schedule padding. KT’s public meetings about their terminal plans were very promising.
July 19, 2025 at 10:52 PM
While it’s true that Pier 50 is too crowded, the delays were because the orcas were present near Bremerton terminal, which requires all ships to cut engines and avoid the area/delay departures.
July 19, 2025 at 10:33 PM
It's not necessarily because of using light vs heavy rail, its because the tracks in the downtown tunnel are the type designed to be embedded in concrete (which they are), which makes repairs much more challenging and the tracks less durable.
June 24, 2025 at 2:34 PM
My understanding is that its a mix of cost pressures, & the LRV fleet not going as far as they expected. Since they opened Lynnwood (& even before), they were using more gap trains than they expected to need to use to keep 8min svc which makes it hard to do 6 minute svc while still doing maintenance
June 6, 2025 at 2:32 PM
Thank you! I think it would be super cute! (And would love to participate)
April 14, 2025 at 8:58 PM