Arthur David Olson
dashdashado.bsky.social
Arthur David Olson
@dashdashado.bsky.social
ADO about nothing much.

Wan, testy, and reedy.

Takoma Park, MD, USA.

Here it's (mostly) dull live streams of city council meetings and quarterly checks of infrastructure matters. For just the less-dull stuff, see @dashdashado@wandering.shop.
#TakomaPark council: auditor moves on to a slide covering fund balances.
November 13, 2025 at 1:02 AM
#TakomaPark council set to start at 7:30. Good news: public comments are on the agenda tonight. Better news: no Secret Session tonight. (Alas, there is one tomorrow night.)
November 13, 2025 at 12:15 AM
Quarterly check good news: with the return of Standard Time, both clocks on level 2 of the Silver Spring Transit Center are correct. (Images from times shown.) Thanks @metrobusinfo.bsky.social.

Next: remove both before March 8, 2026 (when Daylight Saving Time next starts).

@wmatagm.bsky.social
November 12, 2025 at 7:13 PM
Noticed that the (new since a merger) checking account withdrawal slips at the bank I use allows for withdrawals of up to $100 million. I'm guessing the branch does not have that much cash on hand; a big withdrawer would get to settle for a cashier's check.
November 12, 2025 at 6:25 PM
Good news: real-time display removed from stop 2000172 (East-West Highway near Colesville Road). Thanks @metrobusinfo.bsky.social.

Next steps: install and maintain paper timetables (both Metrobus and @rideonmct.bsky.social); remove the dregs (mount, button, and solar panel).

@wmatagm.bsky.social
November 12, 2025 at 6:15 PM
Quarterly @metrobusinfo.bsky.social and @metrorailinfo.bsky.social check: still two-letter rail line abbreviations most everywhere except the rail system diagram (which uses one-letter abbreviations).

Fix: revert the rail system diagram.

@wmatagm.bsky.social
November 11, 2025 at 10:39 PM
Quarterly @metrorailinfo.bsky.social check: still animated rail arrival time displays.

Fix: remove and sell every last expensive, unreliable electronic display in the system.

And: forced resignations of those who ordered it, wasting money on programming and driving up fares.

@wmatagm.bsky.social
November 11, 2025 at 10:11 PM
Quarterly @metrorailinfo.bsky.social check: still starts automated public address announcements with "May I have your attention please?" Then impolitely forges ahead even when I respond "No."

Fix: "Your attention please" (as at Amtrak's Union Station).

@wmatagm.bsky.social
November 11, 2025 at 10:01 PM
Quarterly @Metrorailinfo.bsky.social check: still no station area maps at revamped Green Line Stations (in image, Hyattsville Crossing Station).

@wmatagm.bsky.social
November 11, 2025 at 8:43 PM
New @metrorailinfo.bsky.social check: dead platform display ar Greenbelt Station. (Looks as if this is a still-under-wraps replacement display.)

Fix: remove and sell every last expensive, unreliable electronic display in the system.

@wmatagm.bsky.social
November 11, 2025 at 7:36 PM
Final quarterly @metrorailinfo.bsky.social check: still a pylon signs showing Yellow Line service at Greenbelt. (This problem due to go away 12/21/2025, to be replaced by a slew of new problems.)

@wmatagm.bsky.social
November 11, 2025 at 7:06 PM
Quarterly @metrorailinfo.bsky.social check: still out-of-date pocket guides at North Bethesda Station. (Oddly, the guides are up to date.)

Now: recycle the out-of-date pocket guides.

Later: stock up-to-date pocket guides.

@wmatagm.bsky.social
November 11, 2025 at 6:23 PM
Quarterly @metrobusinfo.bsky.social and @metrorailinfo.bsky.social check: still no Metrobus schedules at North Bethesda Station. (There are faux schedules, with service frequency charts rather than timetables.)

@wmatagm.bsky.social
November 11, 2025 at 6:15 PM
New @metrorailinfo.bsky.social check: out-of-date (2024) guides at Forest Glen Station.

Now: recycle the guides.

Later: stock up-to-date guides.

@wmatagm.bsky.social
November 11, 2025 at 5:13 PM
Quarterly @metrorailinfo.bsky.social check: northbound series-7000 train displays still automatedly announce Mt. Vernon Square as a Yellow Line transfer station. The Yellow Line does not (now) run north of Mt. Vernon Square.

Fix: sell every electronic display in the system.

@wmatagm.bsky.social
November 10, 2025 at 11:27 PM
Quarterly @metrorailinfo.bsky.social check: still lone Exitfare machines at Potomac Yard and Suitland stations, leaving riders in the lurch when they break.

Fix: eliminate fares and fare equipment (including fare gates).

@wmatagm.bsky.social
November 10, 2025 at 11:18 PM
Quarterly @metrorailinfo.bsky.social check: still inconsistent "area of rescue assistance" and "area of refuge" signage at Metrorail's Congress Heights Station.

Fix: remove or paint over the signage on the door.

@wmatagm.bsky.social
November 10, 2025 at 11:12 PM
Quarterly @metrorailinfo.bsky.social check: still "out of service" cabinets at Congress Heights Station and Union Station Station whose torn labels are signs that they're still being used.

Fix: remove and sell all such cabinets in the system.

@wmatagm.bsky.social
November 10, 2025 at 10:46 PM
Quarterly check mixed news.

Good: L'Enfant Plaza rail line diagrams now shown Silver Line service to New Carrollton. Thanks @metrorailinfo.bsky.social.

Bad: wall and pylon signs still don't.

@wmatagm.bsky.social
November 10, 2025 at 10:35 PM
New @metrorailinfo.bsky.social check: "Station" used on platform signs at Potomac Yard Station (in contrast with others, such as L'Enfant Plaza Station, where it is not.

Fix: remove "Station."

@wmatagm.bsky.social
November 10, 2025 at 10:17 PM
Quarterly @metrorailinfo.bsky.social check: still no station area map at Potomac Yard Station.

@wmatagm.bsky.social
November 10, 2025 at 10:03 PM
Quarterly check good news: Suitland Station pylon rail line diagrams now up to date. Thanks @metrorailinfo.bsky.social.

@wmatagm.bsky.social
November 10, 2025 at 10:00 PM
Quarterly @metrobusinfo.bsky.social and @metrorailinfo.bsky.social check: still no bus schedules (not even faux schedules) at Potonac Yard Station.

@wmatagm.bsky.social
November 10, 2025 at 9:48 PM
Quarterly @metrorailinfo.bsky.social check: still out-of-date (2024) guides and pocket guides at Potomac Yard Station.

Now: remove them.

Later: replace them with up-to-date versions.

@wmatagm.bsky.social
November 10, 2025 at 9:13 PM
Renewed @metrorailinfo.bsky.social check: platform display out at Potomac Station.

Fix: remove and sell every last expensive, unreliable electronic display in the system.

@wmatagm.bsky.social
November 10, 2025 at 8:57 PM