Instead of addressing the disintegrating floor due repeated flooding as there is no drainage its patch and hide, with a bonus extra trip hazard
Instead of addressing the disintegrating floor due repeated flooding as there is no drainage its patch and hide, with a bonus extra trip hazard
🥳
Even bookable online with Apple Wallet Support
🥳
Even bookable online with Apple Wallet Support
€24 billion spend on transport up to 2030, no breakdown no project list
We also know they are careless, as the front page has a photo of a train in Belfast which isn’t certified to operate on Irish Rail
€24 billion spend on transport up to 2030, no breakdown no project list
We also know they are careless, as the front page has a photo of a train in Belfast which isn’t certified to operate on Irish Rail
The operative drops the strimmer in shock
The earth wire fails and parts in two and falls to the ground
🧵
The operative drops the strimmer in shock
The earth wire fails and parts in two and falls to the ground
🧵
Team sent out to perform vegetation removal, between Blackrock and Booterstown. 2 with strimmers and a look out
One of the strimmers was using a metal disk not the usual nylon wire…
Someone cuts into the 1500v DC feed cable
A 🧵
Team sent out to perform vegetation removal, between Blackrock and Booterstown. 2 with strimmers and a look out
One of the strimmers was using a metal disk not the usual nylon wire…
Someone cuts into the 1500v DC feed cable
A 🧵
Doesn’t say no trains, it relies on PR double speak and forces the customer to investigate on their own time.
Doesn’t say no trains, it relies on PR double speak and forces the customer to investigate on their own time.
Not the first time such a commitment has been made and both the NTA and Garda commissioner stated it’s not needed despite the massive rise in reported incidents on public transport
Not the first time such a commitment has been made and both the NTA and Garda commissioner stated it’s not needed despite the massive rise in reported incidents on public transport
Timetable failed as it lacked redundancy, required repeated tight turnarounds and operating with effectively zero margin to spare
Timetable failed as it lacked redundancy, required repeated tight turnarounds and operating with effectively zero margin to spare
No signage to direct passengers, not using a bus stop, not shown in timetables
All setup to later claim it’s not needed as it wasn’t used
No signage to direct passengers, not using a bus stop, not shown in timetables
All setup to later claim it’s not needed as it wasn’t used
No sign to say it’s a station, timetable 11 years out of date, no signage or information and the steps to the platform are loose
No sign to say it’s a station, timetable 11 years out of date, no signage or information and the steps to the platform are loose
9 trains in a row late
9 trains in a row late
Second entrance at Tara Street is a disgrace, locked up emergency exit, heavy rust and a disgusting smell
Passengers deserve better
Second entrance at Tara Street is a disgrace, locked up emergency exit, heavy rust and a disgusting smell
Passengers deserve better
But we do prefer the 'green' interior from the mock up