I wanted to do this in a day, but ran into some complications with the crane that set me back.
I wanted to do this in a day, but ran into some complications with the crane that set me back.
Why yes, and I already have the perfect idea
Why yes, and I already have the perfect idea
The actual number is probably double that, I've been doing this since July
The actual number is probably double that, I've been doing this since July
- strip interior
- evacuate AC refrigerant
- Bring to body shop for rust and paint
- rebuild engine
- rewire
- think about EJ/suspension swap later
- strip interior
- evacuate AC refrigerant
- Bring to body shop for rust and paint
- rebuild engine
- rewire
- think about EJ/suspension swap later