Long term non-building construction inflation is running about 5%. Over 4 years, that’s a 21% increase in project cost.
Long term non-building construction inflation is running about 5%. Over 4 years, that’s a 21% increase in project cost.
KFC when drunk would not end well. 🤮
KFC when drunk would not end well. 🤮
Sometimes trying to eat lox after feeding the cat just triggers something
Sometimes trying to eat lox after feeding the cat just triggers something
Republicans eliminated it as part of the 2000 Red States gerrymander. However, one of the districts was usually still close enough that a conservative Democrat had a chance to win.
Republicans eliminated it as part of the 2000 Red States gerrymander. However, one of the districts was usually still close enough that a conservative Democrat had a chance to win.