However realistically I'd think the real capacity constraints are around Ringsted and Lübeck Hbf.
However realistically I'd think the real capacity constraints are around Ringsted and Lübeck Hbf.
4/4
4/4
A 3rd option is to use a battery-train from the current Lokaltog tender, wires on the 25 kV stretch from Nykøbing, battery for the short German bit to Burg, to meet a German regional system. 3/4
A 3rd option is to use a battery-train from the current Lokaltog tender, wires on the 25 kV stretch from Nykøbing, battery for the short German bit to Burg, to meet a German regional system. 3/4
1/4
1/4
Can't wait for Baltic Expres to get a proper dining car all the way to Prague in the new timetable!
Can't wait for Baltic Expres to get a proper dining car all the way to Prague in the new timetable!